{"id":3846,"date":"2018-03-18T13:19:26","date_gmt":"2018-03-18T03:19:26","guid":{"rendered":"https:\/\/prodex.com.au\/?p=3846"},"modified":"2020-09-20T19:37:48","modified_gmt":"2020-09-20T09:37:48","slug":"innovation-and-new-product-development-npd-qa-with-bob-cooper","status":"publish","type":"post","link":"https:\/\/prodex.com.au\/th\/innovation-and-new-product-development-npd-qa-with-bob-cooper\/","title":{"rendered":"Innovation and New Product Development (NPD) Q&#038;A with Bob Cooper"},"content":{"rendered":"<p><em>During a recent webinar titled <a href=\"http:\/\/www.sopheon.com\/upcoming-webinar-five-drivers-successful-product-innovation\/\" target=\"_blank\" rel=\"noopener noreferrer\">The Five Most Important Drivers of Success in Product Innovation<\/a> \u2013 That Most People Get Wrong! with Dr. Robert Cooper, President of the Product Development Institute Inc., he fielded a number of audience questions. Bob is also the creator of the Stage-Gate\u00ae system, the widely used innovation and new product development process and methodology used by leading organizations around the world to drive new products to market. Based on his broad and deep knowledge, here are his answers to a number of the audience questions:<\/em><\/p>\n<p><!--more--><\/p>\n<p><span style=\"color: #e92529;\"><em><strong>AUDIENCE: <\/strong>For the metric that one out of nine concepts are commercially successful, are these just concepts or are they fully vetted \/ funded projects? We track project success, but do not currently track concept success, and are wondering if we should be looking at both.<\/em><\/span><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> These are early stage concepts, more than ideas, but not fully defined products as one might find in a business case. That is, they are not yet projects in the development stage. See the attrition curve chart below from the book <a style=\"color: #333333;\" href=\"http:\/\/www.bobcooper.ca\/books\/winning-at-new-products\" target=\"_blank\" rel=\"noopener noreferrer\">Winning at New Products<\/a> (4th ed., p. 19); it\u2019s a different source, so this chart shows a 7:1 ratio, rather than the 9:1 I stated in the webinar. If we started with raw ideas, it\u2019s 60:1.<\/span><\/p>\n<p><img decoding=\"async\" class=\"aligncenter\" style=\"width: 500px;\" src=\"http:\/\/prodex.com.au\/wp-content\/uploads\/2015\/03\/Cooper01.png\" alt=\"\"><\/p>\n<p><span style=\"color: #333333;\">Thus, the concepts cited in the webinar are somewhere around stage one of the idea-to-launch (I2L) gating model as shown in the webinar (slide 19) in the diagram below.<\/span><\/p>\n<p><span style=\"color: #333333;\"><img decoding=\"async\" class=\"aligncenter\" style=\"width: 500px;\" src=\"http:\/\/prodex.com.au\/wp-content\/uploads\/2015\/03\/Cooper02.png\" alt=\"\"><\/span><\/p>\n<p><span style=\"color: #333333;\">Having said that, it\u2019s very difficult to operationally define a concept or an idea. Most firms would start the clock at the equivalent of gate three, approve business case, and determine project performance from this point onwards. That is, from the point where the project is well defined, which means an approved business case. From a practical standpoint, I concur. However, there\u2019s no harm in tracking the success (or attrition) of ideas and concepts, especially if you\u2019re interested in measuring the performance of your ideation efforts, or best sources of ideas.<\/span><\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> Do the studies conducted show strong correlation between organic growth and the metrics of NPD performance between top, average and bottom performing companies?<\/span><\/em><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> Sadly, we lack data on this. The problem is that many factors correlate with business performance, when measured by metrics such as growth, profitability, and return-on-shareholder-equity. Many of these performance drivers have nothing to do with product development. For example, organic growth is likely a function of the growth rate of the markets you are in, your strategy (how robust it is, and how effectively it is implemented), the quality of your management team, your core competencies, the competitive environment, and so on.<\/span><\/p>\n<p><span style=\"color: #333333;\">While NPD performance is likely one driver of organic growth, there are many other confounding factors, hence it is often difficult to get a strong connection between new product success factors or performance and metrics that capture the overall or total business performance. There are various research studies such as <a style=\"color: #333333;\" href=\"http:\/\/www.adlittle.com\/downloads\/tx_adlreports\/TIM_2013_Innovex_Report.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Getting a Better Return on Your Innovation Investment (PDF)<\/a> by Arthur D. Little that show businesses doing well have strong NPD programs.<\/span><\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> Our Stage-Gate process really starts at approval of a business case. I recognize that we need to introduce one, if not two, gates prior to approving the business case. Any suggestions on how to change mindsets to introduce new gates without making people feel like we are starting from scratch?<\/span><\/em><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> Many studies reveal that the activities that occur before formal development begins, the front-end homework, market studies, technical assessment, building the business case are the really pivotal activities. They create the foundation for the project and the seeds of success or failure are often found in these pre-development phases (see for an example, <a style=\"color: #333333;\" href=\"http:\/\/www.bobcooper.ca\/articles\/best-practices-in-new-product-development-the-success-drivers\" target=\"_blank\" rel=\"noopener noreferrer\">New Products \u2013 What Separates the Winners from the Losers and What Drives Success<\/a>). Thus, the game is won or lost in the first five plays. This is perhaps why Toyota\u2019s 5 NPD Principles include front-end load your project, as a plea to do more work earlier in the project to do the needed early stage homework.<\/span><\/p>\n<p><span style=\"color: #333333;\">Given the importance of the front-end, it makes sense to capture these vital activities and include them in your idea-to-launch (I2L) system, and not merely assume that they\u2019ll happen. They often don\u2019t, which explains why so many new product failures can be traced directly to the front-end of the project.<\/span><\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> Many companies often believe that the new product strategy is implicit in their company or brand strategies. How do you convince them that they are different and that they need to invest significant time in developing a new product strategy?<\/span><\/em><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> Bore them with the facts! There are countless studies that reveal that having a product innovation strategy for the business is strongly connected to the new product performance of the business. In short, a solid, well-defined strategy pays off. I cited two such studies in my webinar (see near the beginning). See for an example, <a style=\"color: #333333;\" href=\"http:\/\/www.bobcooper.ca\/articles\/product-innovation-strategy-for-your-business\" target=\"_blank\" rel=\"noopener noreferrer\">Developing a Product Innovation and Technology Strategy for Your Business<\/a>, especially figure one which shows that top performing businesses have the elements of an innovation strategy in place, whereas poor performers do not!<\/span><\/p>\n<p><span style=\"color: #333333;\">There are also the common-sense arguments: Without a strategy you drift, like a ship, without a rudder. You\u2019ll likely end up in a lot of projects in unattractive markets and areas, or worse yet, just too many different and unrelated areas. Strategy helps to define the search fields for effective idea generation to focus your ideation efforts. Your innovation strategy is one of the key criteria for selecting the best projects in portfolio management. And so on.<\/span><\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> Some innovation team leaders and consultants resist communicating areas that are out of bounds because they feel it limits creativity. How should we deal with this?<\/span><\/em><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> It depends on how limiting the defined areas are. Obviously, if strategic areas are defined so as to be very limiting, then creativity is indeed thwarted. So be careful in how tightly you define strategic areas, making sure that they are broad enough to allow creativity and some bolder, more imaginative development ideas and projects to occur.<\/span><\/p>\n<p><span style=\"color: #333333;\">Additionally, some firms allow a discrete percentage of projects to be wildcards or outside the traditional areas as defined in the business\u2019s strategy. These so-called test drill projects are indeed out of bounds, but often uncover new opportunities in a new field. This is not the same as a scattergun approach, because the number of such projects is quite limited.<\/span><\/p>\n<p><span style=\"color: #333333;\">Finally, some pundits argue that too broad a definition of in bounds areas actually hurts creativity and innovation. What happens is that a lot of off-strategy projects are proposed and may even progress. Thus, the firm ends up in a lot of unwanted and perhaps unattractive areas, and also in too many different areas, essentially a scattergun approach. So innovation actually suffers in this scenario.<\/span><\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> If so many companies worldwide with over 73% of US and over 90% of German and Scandinavian companies having implemented a Stage-Gate system, why aren\u2019t they all equality successful? How do the top performers distinguish?<\/span><\/em><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> There are two main reasons.<\/span><\/p>\n<p><span style=\"color: #333333;\">First off, many of the systems these firms have implemented, often with the best of intentions, are either now obsolete or were highly flawed. I cannot tell you how many firms I have visited that claim to have a Stage-Gate system \u201cjust like in the book\u201d and when I inspect it more closely, I often discover that it\u2019s nothing like what was described in my book. They simply got it wrong. It\u2019s a poorly conceived, poorly designed system, and so results aren\u2019t so good.<\/span><\/p>\n<p><span style=\"color: #333333;\">Further, some firms are living in the past, and are using much older versions of Stage-Gate, models typical of the 1990s, but a lot has changed since the 1990s. For an update on what\u2019s new in Stage-Gate, see my website and topic section <a style=\"color: #333333;\" href=\"http:\/\/www.bobcooper.ca\/articles\/next-generation-stage-gate-and-whats-next-after-stage-gate\" target=\"_blank\" rel=\"noopener noreferrer\">Next Generation Stage-Gate and What\u2019s Next After Stage-Gate<\/a>? and in particular, the two articles, What\u2019s Next After Stage-Gate? and also What Leading Companies Are Doing to Re-Invent Their NPD Processes.<\/span><\/p>\n<p><span style=\"color: #333333;\">Secondly, while many firms have a well-designed Idea-to-Launch (I2L) system, they have failed to implement it well or consistently. For example, gate meetings are missed, decisions aren\u2019t made, and gatekeepers behave inappropriately. As we saw in one of the polling questions during the webinar, almost 90% of attendees confess to poor project selection practices, too many projects, too few big projects, not enough resources to do the projects etc. This usually is not the result a bad system, rather a lack of discipline at gates and portfolio reviews!<\/span><\/p>\n<p><span style=\"color: #333333;\">In other firms, project teams sometimes just don\u2019t get it. Expectations are unclear, the work doesn\u2019t get done, business cases are weak, and so on. Sometimes this is due to a lack of training or skills; often it is because there are simply too many projects in the pipeline.<\/span><\/p>\n<p><span style=\"color: #333333;\">Most of these problems are implementation issues, often simply a lack of discipline and a failure to adhere to the spirit of an otherwise well-designed I2L gating system.<\/span><\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> What do you say to the risk that going too flexible in the structure of a Stage-Gate system is just a \u201csop\u201d to those individuals in a company that simply don\u2019t want to have their decisions challenged?<\/span><\/em><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> There are limits to flexibility. Otherwise, soon you have no system at all and it\u2019s back to the chaos of the 1970s, when project teams and R&amp;D folks could do pretty well what they wanted. Back then, budgets were much less constrained, relatively speaking (resources seemed plentiful), and besides, NPD results were not so good.<\/span><\/p>\n<p><span style=\"color: #333333;\">These are relatively good policies for some limits:<\/span><\/p>\n<ul>\n<li><span style=\"color: #333333;\">We have a basic I2L system, regardless of flexibility \u2013 a 5-stage, 3-stage lite and a 2-stage express system. All development projects must go through one of these (specify guides for routing).<\/span><\/li>\n<li><span style=\"color: #333333;\">We have gates where go\/kill decisions will be made. A decision must be made, usually that day, and resources must be committed to the project leader and team right at the gate meeting.<\/span><\/li>\n<li><span style=\"color: #333333;\">There are certain deliverables expected at each gate regardless of the project. Other deliverables are discretionary. However, what will be delivered is agreed at the previous gate and not just on a whim of the project leader or some team member.<\/span><\/li>\n<li><span style=\"color: #333333;\">There are certain expectations regarding key activities (tasks) that will be done regardless in each stage, and quality standards for the execution of those tasks. For example, for major projects, a solid voice of the customer (VOC) study, a financial analysis according to some template, and a technical assessment will all be done in stage 2.<\/span><\/li>\n<\/ul>\n<p><span style=\"color: #333333;\">Bottom line: There is a fine line between flexibility and intellectual laziness or plain and simple lack of discipline. You can have guide books or electronic manuals, templates and training, but ultimately the gatekeepers together with the Stage-Gate process manager must set the expectations.<\/span><\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> Many companies seem to be cutting back on market research because they are trying to do things faster and cheaper. Many consultants are actively dissuading companies from doing research because they say it does not provide insights. How should companies deal with this?<\/span><\/em><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> Customer or user input, at the very front end to generate ideas is key. (See two articles on the best sources of new-product ideas, results of a survey of many firms, and VOC methods are highly-rated by users on my website). Customer inputs achieved via spirals or iterations (a series of build-test-feedback-and-revise loops are vital too. One problem with traditional market research is that customers don\u2019t know what they want until they see it. So get something in front of them early, cheap, and fast. In short, consider it a plea to use this spiraling approach.<\/span><\/p>\n<p><span style=\"color: #333333;\">Perhaps it\u2019s the type of market research that\u2019s being done that\u2019s the problem. Regardless, customer insights are critical: More new products fail due to faulty customer and market information than any other single cause!<\/span><\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> I agree that the customer input is key, but how do you suggest one copes with when customers provide their needs in terms of potential solutions rather than what they want to achieve (e.g. when they are effectively making assumptions about what you can deliver)?<\/span><\/em><\/p>\n<p><strong>BOB:<\/strong> It\u2019s OK that the customer has your next new product. In fact, there\u2019s some research that shows this is very true, especially in some industries. Lab instruments is an example. Just make sure that your front-line people (e.g. sales and tech service) are trained to recognize a customer-developed product, and act on it.<\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> Can you comment on the Innovator Dilemma comparing innovation of sustaining vs. disruptive products.<\/span><\/em><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> Wow! We could spend hours on this topic. Today I fear that, facing the demands of shareholders for short term profitability, too many firms have opted for a new-product effort that results in a pipeline full of modifications, tweaks, product improvements, and small initiatives. These are sometimes called sustaining innovation, but in reality, it\u2019s not innovation at all, but rather a renovation strategy.<\/span><\/p>\n<p><span style=\"color: #333333;\">Our research over the years shows that the proportion of significant innovations and genuine new product projects in the typical development portfolio has dropped in the USA. The chart below shows the trend from the 1990s to today. We have a similar chart that shows that poor performers have a much higher proportion of small projects in their portfolios.<\/span><\/p>\n<p><img decoding=\"async\" class=\"aligncenter\" style=\"width: 500px;\" src=\"http:\/\/prodex.com.au\/wp-content\/uploads\/2015\/03\/Cooper03.png\" alt=\"\"><\/p>\n<p><span style=\"color: #333333;\">This preoccupation with the short-term and low-hanging fruit development projects is most serious, and will ultimately result in the demise of many companies.<\/span><\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> Steve Blank\u2019s customer discovery approach seems to support your customer interface approach.<\/span><\/em><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> Agreed, but he is not the first advocate of this type of methodology.<\/span><\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> Adaptive development. What is your experience of how this approach could lead to trial fatigue at customers, especially in a B2B situation?<\/span><\/em><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> Yes, adaptive development complete with multiple spiral or iterations can lead to user fatigue. Thus the project must be an important one for both the customer (one with significant benefits for him or her) and for you. And the early iterations can even be done online using virtual products, so they are less onerous and maybe fun, even enlightening, for the customer too.<\/span><\/p>\n<p><span style=\"color: #333333;\">Key point: Don\u2019t let doing lots of customer trials (spirals, iterations, user trials) be a substitute for doing your homework up-front with the customer. Again, there is a fine line between good practices here and just plain laziness (unwilling to do the hard work early on). Without that front-end homework, you probably won\u2019t get the product right at all, and then be caught in an endless set of spirals (user trials) which can indeed begin to annoy the customer.<\/span><\/p>\n<p><span style=\"color: #333333;\">For B2C products, not as problematic, as one can go to different groups of customers for iterative feedback along the way. Again, do the front-end homework with customer\/users to yield a higher likelihood of getting the product rights, and save yourself some unnecessary trials or iterations later on. Pay me now, or pay me later!<\/span><\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> Do you have a maturity\/quality scale for PD processes?<\/span><\/em><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> Not really. We do have a maturity model that captures moving from no process to an I2L gating process to portfolio management to a full innovation model or system. Frankly, it might be difficult to generalize a maturity model for just the I2L process, as I see companies following so many different paths to reach their destination (and of course, many do get lost along the way!). We do have a model for the design and implementation of an I2L process however.<\/span><\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> I attended your course, several years ago at McGill University. What major changes have you made to the Stage-Gate process in the interim?<\/span><\/em><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> Wow, several years ago was probably more like 10-15 years ago, as I have not given my seminars at McGill in Canada for many years. And a lot has happened since then, so much, that this topic is a full-day question and answer session.<\/span><\/p>\n<p><span style=\"color: #333333;\">In a nutshell, leading firms have adopted a \u201cTriple A\u201d approach \u2013 more agile, more accelerated, and more adaptive and flexible. A comprehensive article on what firms have done is available. For example, see What\u2019s Next After Stage-Gate (both the long and short versions) in the section Next Generation Stage-Gate\u00ae and What\u2019s Next After Stage-Gate\u00ae. There are another few other articles in that section that are not quite so step-out for more modest improvements to Stage-Gate. We do have a two day seminar on this topic, so it\u2019s a bit tough to answer in a paragraph or two.<\/span><\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> Many companies vary in their skills and priorities. The top five drivers in this webinar are not listed in a priority order for everyone, it is infinitely variable. Some of the other nine problem areas you mentioned could come forward and be a priority for some.<\/span><\/em><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> Agreed. There are a number of success drivers or factors in new-product development that I did not cover in the webinar, both at the project level and at the business-unit level. Some of these may be drivers or practices relevant for you. I tended to focus in the webinar on those factors with the highest impact and\/or where performance is most in need of improvement, again, based on research.<\/span><\/p>\n<p><em><span style=\"color: #e92529;\"><strong>AUDIENCE:<\/strong> Do you have any statistics on the percentage of dropout of NPD\u2019s in various stages, 1, 2, etc.?<\/span><\/em><\/p>\n<p><span style=\"color: #333333;\"><strong>BOB:<\/strong> Yes, but be careful about using averages. First, no one is average, and second, if you use these average drop-off percentages as a guide for how many projects you should be killing at each gate, it may become a self-fulfilling prophecy. Not good. For data, see the chart in the answer to my first question in this series. That attrition chart comes close to giving you what you want. Again, there are great dangers in generalizing.<\/span><\/p>\n<p><em>Dr. Robert Cooper is a world expert in the field of new product management. He was named The World\u2019s Top Innovation Management Scholar and The Quintessential Scholar in the U.S. publication, Journal of Product Innovation Management (JPIM). He is one of three Crawford Fellows of the Product Development &amp; Management Association (PDMA). Bob is the creator of the Stage-Gate\u00ae system, now widely used by leading organizations around the world to drive new products to market. He has helped hundreds of leading corporations design and implement his Stage-Gate\u00ae innovation and new product development process. He is also the developer of the NewProd\u00ae system for screening and diagnosing new product projects.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>During a recent webinar titled The Five Most Important Drivers of Success in Product Innovation \u2013 That Most People Get Wrong!<\/p>","protected":false},"author":4,"featured_media":9507,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[248,254],"tags":[152,153,154,122,65,57],"_links":{"self":[{"href":"https:\/\/prodex.com.au\/th\/wp-json\/wp\/v2\/posts\/3846"}],"collection":[{"href":"https:\/\/prodex.com.au\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/prodex.com.au\/th\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/prodex.com.au\/th\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/prodex.com.au\/th\/wp-json\/wp\/v2\/comments?post=3846"}],"version-history":[{"count":0,"href":"https:\/\/prodex.com.au\/th\/wp-json\/wp\/v2\/posts\/3846\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/prodex.com.au\/th\/wp-json\/wp\/v2\/media\/9507"}],"wp:attachment":[{"href":"https:\/\/prodex.com.au\/th\/wp-json\/wp\/v2\/media?parent=3846"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/prodex.com.au\/th\/wp-json\/wp\/v2\/categories?post=3846"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/prodex.com.au\/th\/wp-json\/wp\/v2\/tags?post=3846"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}